Two consultants can submit the same project to the same municipality and get permits three months apart. Ten habits that separate applications which sail through from the ones that stall.
How a plain-language conversation replaces the menu maze at the start of every Ontario permit application, and what the research-and-phone-calls workflow it replaces really costs.
Checklist review per drawing type plus a setback, height and coverage check against your lot’s zoning, so the first comment cycle is about design rather than missing basics.
Every municipality wants the same package delivered a different way. How Permits2Go assembles it to each city’s conventions and files it while you approve each step.
The owner’s signature is one line on one form and routinely costs a week. Pre-filled forms, signing links and signed copies that file themselves close that gap.
Status calls, questions about a specific drawing and comment clarifications, placed for you with a transcript and proposed tracking updates you approve.
A per-application notes tab with pinned notes, attachments, full edit history, notes written by the platform from calls and emails, and selected notes shared with your client.
Log every city visit per application, keep the deficiency checklist current, file city inspection notices automatically, and get the visit onto your calendar.
The official municipal forms filled from your project details before you open them, ready to review, edit and sign, so you correct a draft instead of typing the same address onto a dozen forms.
Most delays blamed on the city are really tracking failures. What to track for every permit, the four ways losing track costs money, and how to run a weekly review.
Restaurants, contractors, salons, taxis, shops — Toronto and Hamilton license hundreds of business categories between them. Who needs a licence, and where to find the guide for yours.
Cutting a new entrance into your foundation is structural work — a permit is always required. Here's the zoning, engineering and cost picture for side entrances and walkouts.
Owners ask “how do I get a permit?” Consultants ask “what will stop this permit from being issued?” The five questions professionals put to building departments.
Small, low, detached decks can be exempt — but most attached or elevated decks need a permit. Here's how to tell which side of the line your project falls on.
Toronto charges permit fees by floor area and work type, with a minimum fee for small projects. Here's what typical projects pay — and the costs beyond the permit.
Ontario law gives municipalities 10 to 30 business days to review a complete application. Real projects often take longer — here's why, and how to keep yours on track.
Before the Building Code ever applies, zoning decides what you can build, where, and how big. A plain-English tour of the rules and what to do when your project doesn't fit.
Toronto allows detached backyard homes city-wide. What separates an approvable garden suite from a dead end usually comes down to a few feasibility checks — here they are.